XALANTEdge

Edge · Xalant Edge · Capacity estimator

Edge · Tool

Capacity estimator

Three inputs in, four figures out, and every line of the arithmetic on the page. It sizes a site. It quotes nothing.

Design estimate — derived, never measured

The estimate

Anything below one pod rounds up to one pod. A pod is a container, not a fraction of one.

Sets the rack density, which sets the cooling line, which sets the design PUE and the backhaul allowance.

The markets in the pipeline. Selecting one sets which of the two deployment clocks the estimate is on.

The estimate below updates as you change these. The address bar keeps up, so the link carries the estimate with it.

Design estimate · derived from published design constants, not measured

20
Containerised pods
6.5
MW electrical
10
Gbps backhaul
1
Gateway pads

Design estimate for South Oregon: 20 containerised pods, 6.5 megawatts electrical at a design PUE of 1.3, 10 gigabits per second of backhaul across 1 gateway pad. Time to power: first build.

Time to power · First build

The first build in South Oregon is planned to take up to nine months of controlled build. It is the one that proves the kit.

The working

  1. Containerised podspods = ceiling( 5 ÷ 0.25 )20
  2. Electrical load at the meterMW electrical = 5 × 1.36.5 MW
  3. Backhaul the workload asks forGbps = 5 × 210 Gbps
  4. Gateway padsgateways = ceiling( 10 ÷ 10 )1

Cooling line: N+1 precision air, which is what selects the design PUE above.

Every constant it used

IT load per pod0.25 MW-IT
Xalant Edge design basis (spec §5.2 unit ladder) · as of 2026-09-11 · A Xalant design figure, not a vendor rating. The estimator divides the requested IT load by this.
Design PUE, containerised pod1.3 PUE
Xalant Edge design basis (spec §5.2 pod spec table) · as of 2026-09-11 · Design target for N+1 precision air. Renders as a design target, never as a measured figure.
Backhaul allowance, HPC2 Gbps per MW-IT
Xalant Edge design basis (spec 5.2 workload profiles) · as of 2026-09-11 · Design allowance, not a measurement. Bulk job input and result sets move in scheduled windows rather than continuously.
Design capacity per gateway10 Gbps
Xalant Communications design basis (spec §5.3, §13) · as of 2026-09-11 · A Xalant design figure for a gateway pad. Never a third-party product rating, and always stated for the whole gateway.
Send this estimate to Xalant

Worked examples

Four estimates, computed the same way

Every row below comes out of the same function the tool uses, at build time. The second row is the first row with one input changed, which is the clearest way to see what the workload actually does to the answer.

Worked examples — design estimates, not measured figures
InputPodsMW electricalGbpsGatewaysTime to power
5 MW-IT · HPC · Milwaukee206.5101Repeat site
5 MW-IT · AI training · Milwaukee205.7551Repeat site
0.25 MW-IT · AI inference · South Oregon10.3311First build
12 MW-IT · AI inference · North Georgia4815.6485Repeat site

The formulae

  1. Containerised podspods = ceiling( 5 ÷ 0.25 )20
  2. Electrical load at the meterMW electrical = 5 × 1.36.5 MW
  3. Backhaul the workload asks forGbps = 5 × 210 Gbps
  4. Gateway padsgateways = ceiling( 10 ÷ 10 )1

Shown for the first row. The tool prints the same four lines for whatever is currently selected.

Exclusions

What this estimate leaves out

An estimate that hides what it left out is worse than no estimate.

  • Bridge fuel. The tonnes-per-day line needs a sourced heat-content figure for LPG and there is not one in the constants file yet, so it is left out rather than guessed at.
  • Local approval time. Zoning, environmental and building permits sit outside every duration here, and the jurisdiction sets them, not Xalant.
  • Interconnection. Nothing on the pad is designed to depend on a public utility, so no queue position is modelled either way.
  • Price. This tool sizes a site. It quotes nothing.
Line drawing of the Xalant campus: the hall row, the substation and the gateway dish, derived from a reference render.

Reference render

The campus, drawnAI render — reference only

Site & capacity · Request

Send us the estimate and we will tell you what we would change about it.